ASBESTOS REFURBISHMENT
SURVEYS IN ESSEX

Planning changes to an existing building means looking beyond the surfaces you can see. Removing a ceiling, lifting a floor or opening a partition can expose materials that have remained undisturbed for decades. An asbestos refurbishment survey helps establish whether asbestos is present in the areas affected before contractors begin.

At Asbestos Surveys Essex, we provide asbestos refurbishment surveys across Essex, Kent and London. We welcome enquiries from homeowners, landlords, business owners, property managers and building contractors preparing for renovation or alterations.

50+ Years Industry Experience

BOHS P402 Qualified Surveyors

UKAS Accredited Laboratory Testing

72-Hour Report Turnaround

asbestos commercial demolition survey eltham london 1

Managing Asbestos Risks Before Refurbishment or Demolition

This survey is designed to locate and assess all asbestos-containing materials (ACMs), as far as reasonably practicable, within the areas affected by planned works. For refurbishment projects, it focuses specifically on the parts of the building where work will take place, while for demolition, it covers the entire structure to ensure a complete assessment of asbestos risks.

A Refurbishment and Demolition (R&D) survey is a highly intrusive process that involves destructive inspection methods to access hidden and hard-to-reach areas. This level of detail is essential for identifying asbestos prior to any work starting, helping to prevent exposure and ensure a safe working environment.

What is an Asbestos Refurbishment Survey?

An asbestos refurbishment survey is an intrusive investigation intended to locate and identify, as far as reasonably practicable, asbestos-containing materials within the area where refurbishment will take place. It includes concealed materials that could be affected by the proposed work.

The inspection may involve destructive access into the building fabric. Its purpose is to provide information for planning the work and arranging asbestos removal where required before refurbishment begins.

A survey can cover a defined part of a building rather than the entire property, provided that the scope includes everything the project will disturb. A room name alone may be insufficient: associated voids, service routes and adjoining construction can also matter.

asbestos refurbishment survey newmarket suffolk 5
asbestos refurbishment survey romford

When should you arrange a refurbishment survey?

Asbestos needs consideration early when work is planned in a building constructed or refurbished before 2000. HSE advises assuming asbestos may be present in these buildings until there is suitable evidence otherwise. Its location may be hidden behind later finishes.

What You Can Expect

Each refurbishment & demolition survey is completed by experienced surveyors using intrusive inspection methods where necessary, with clear reporting and practical recommendations provided to support safe and compliant refurbishment or demolition projects.

asbestos survey report

NEED AN ASBESTOS SURVEY & not sure where to start?

Speak To An Asbestos Expert Today

We’ll help you choose the right survey and get everything arranged quickly, with straightforward advice and reliable results you can trust.

asbestos refurbishment survey chelmsford essex

Projects that can require investigation include:

The extent of investigation depends on the work and the information already available. Discuss the project before asking a builder to start opening up. Early planning gives you time to address findings without relying on last-minute changes to the programme.

Asbestos Refurbishment Surveys and Legal Compliance

The Control of Asbestos Regulations 2012 apply to work that could expose people to asbestos. Regulation 5 requires employers to identify whether asbestos is present before undertaking relevant demolition, maintenance or other work liable to expose employees. Where doubt remains, the regulations require asbestos to be assumed present and the applicable precautions followed.

A refurbishment survey is a recognised way to obtain the project-specific information needed before disturbing building fabric. The report supports compliance; it does not replace the contractor’s risk assessment, plan of work or other responsibilities.

The Construction (Design and Management) Regulations 2015 also apply to construction projects. Commercial clients and their project teams need suitable arrangements and relevant pre-construction information. For domestic projects, client duties normally pass to the contractor or principal contractor, subject to the arrangements permitted by those regulations.

The specific Regulation 4 duty to manage generally concerns non-domestic premises and relevant residential common parts. Its usual exclusion from the interior of a private home does not mean tradespeople can ignore asbestos when working there.

asbestos refurbishment survey newmarket suffolk 5

Frequently Asked Questions

What is a Refurbishment and Demolition (R&D) asbestos survey?

An R&D asbestos survey is a fully intrusive inspection carried out before any refurbishment or demolition work. Its purpose is to locate and identify all asbestos-containing materials (ACMs) so they can be safely managed or removed prior to work starting.

Understanding your proposed work

The first step is defining the refurbishment. Drawings, specifications and a room-by-room description help establish which materials and structures will be affected.

Explain how far the work will extend. Replacing cupboard doors presents different questions from stripping a kitchen back to the walls and renewing services beneath the floor. If your contractor has proposed additional access or new cable routes, include these details.

HSE’s HSG264, Asbestos: The survey guide, addresses survey planning, inspection, reporting and how clients should use the information. A clear brief helps the resulting report answer the questions relevant to your project.

Preparing the inspection area

Intrusive access needs planning around the building’s condition and hazards. Access permissions, service isolation and any specialist assistance should be agreed before the visit.

Because a refurbishment survey can disturb materials and cause damage, the area being surveyed must be vacated. Arrangements must protect adjoining occupied spaces. The surveyor must confirm that the surveyed area is fit for reoccupation afterwards; the checks required depend on the circumstances.

Discuss making good before booking. Opening the fabric of a building may leave finishes damaged, and reinstatement arrangements should be understood in advance.

Investigating concealed construction

Within the agreed scope, inspection may require access behind linings, beneath floor finishes and into voids. The approach depends on the construction and the proposed refurbishment.

Useful preparation includes supplying records of previous alterations and identifying areas that have been overclad or enclosed. A property may contain several generations of construction, so recently decorated surfaces do not establish the age of what lies behind them.

Restrictions must be recorded clearly. An area that could not be investigated cannot be assumed safe for subsequent work. Further access may be needed before the relevant refurbishment proceeds.

Taking samples and identifying materials

Suspect materials cannot be reliably identified by appearance alone. Where appropriate, a suitably trained person takes representative samples for analysis by an accredited laboratory.

Materials encountered can include textured coatings, floor tiles and associated adhesives, insulating board, cement products and insulation. These examples do not mean every such product contains asbestos. Findings depend on inspection and, where sampled, laboratory results.

Do not remove your own samples or ask a contractor to break suspect materials out before the survey. Let the inspection establish the appropriate approach.

Yes. If you are planning refurbishment or demolition work on a property built before 2000, an R&D asbestos survey is required to comply with asbestos regulations and ensure safety.

A management survey is non-intrusive and designed for buildings in normal use. An R&D survey is far more invasive and involves opening up walls, ceilings, and floors to find hidden asbestos before construction work begins.

Yes, to some extent. R&D surveys are intentionally intrusive and may involve breaking into building materials to access concealed areas. For this reason, they are usually carried out in vacant properties or areas due for refurbishment.

In most cases, no. Because of the intrusive nature of the survey and potential exposure risks, the area being surveyed should be vacated beforehand.

The time required depends on the size and complexity of the building, but surveys can range from one day to several days for larger or more complex sites.

Any identified or presumed asbestos must be safely removed or managed before refurbishment or demolition work begins. The survey report will clearly outline what action is required.

If the work is likely to disturb the building fabric (e.g. removing walls, ceilings, or structural elements), then yes—an R&D survey is required regardless of project size.

We provide a fast turnaround, with detailed reports typically delivered within 72 hours of survey completion.

A useful refurbishment survey report clearly connects its findings to the project. It should explain the agreed scope, areas inspected, materials identified, sample results and any outstanding restrictions.

Location references, photographs and plans help the project team identify affected materials. The report should also make clear where further investigation is needed.

Read the findings before finalising the construction programme. Share the report with the people planning and carrying out the work, and resolve questions about its scope before access begins. A survey covering one phase should not automatically be applied to later phases with different work requirements.

A survey is commissioned against a particular scope. If the project expands into another room, opens additional voids or changes the depth of strip-out, the original investigation may no longer be sufficient.

For example, a survey for replacing finishes in a shop should not automatically be treated as covering a later decision to alter the flats above. Send revised drawings or instructions for review before the additional work starts.

If unexpected suspect material is discovered during construction, stop work in the affected area, prevent access and obtain competent advice. Do not continue on the assumption that an earlier report covers every possible discovery.

Refurbishment surveys across Essex, Kent and London

To discuss your survey, provide the property address, approximate size, current use and a description of the planned work. Include drawings, previous asbestos reports and your intended start date where available.

Explain any known access restrictions and whether the proposed inspection area will be vacant. These details help establish the scope and the arrangements needed for an intrusive survey.

Contact Asbestos Surveys Essex to arrange an asbestos refurbishment survey in Essex, Kent or London and obtain the information your project team needs before renovation begins.

Scroll to Top